inside-picture-mcdonalds-restaurant-caledon-builditbydesign2-1920x1272

McDonald’s mandate to find a niche within the metropolitan setting and a smaller footprint, means that they must strive to maintain integrity to the brand as well as building out in a timely manner. By creating a complex schedule utilizing a critical path, BUILD IT was able to target a turnover of 5 weeks including all drive-thru requirements.

What our clients say